What are the contents of the factory inspection of oxygen generator

1. Appearance inspection
Before the equipment leaves the factory, first of all, we must visually inspect the appearance of all the equipment we provide. Including whether the equipment paint color is consistent, whether the surface is flat, whether there are bruises and scratches, whether the weld seams are polished clean, whether there are burrs and residual welding slag, whether the structure of the equipment is reasonable and beautiful, whether the chassis is smooth, whether the wiring of the electric control part is neat, no hidden problems, etc.
2. Sealing test
In our factory, connect the oxygen equipment with the air compressor and air pretreatment equipment, test run the whole system, and check whether there is air leakage in the pipeline and valve of the oxygen machine.
3. Electrical control and instrumentation inspection
During the test run of the equipment in our plant, test the electric control according to the method in this manual. Whether the system is running normally, whether the pressure gauge, flow meter and other instruments are working normally.
4. Technical index testing
In our factory, imitate the user's oxygen equipment conditions and requirements, connect the oxygen equipment with the air compressor and air pretreatment equipment, test the whole system, test the actual gas production, purity, dew point and other parameters of the oxygen machine to determine whether the equipment reaches the technical indicators specified in the contract. If the indicators do not reach, analyze the reasons, and make appropriate adjustments to the equipment until it reaches the specified technical indicators.
5. Equipment packaging inventory
After the factory inspection of all provided equipment is completed, before the transportation of the complete set of equipment, the equipment that needs to be packaged is packaged in a way suitable for transportation. At the same time, inventory all the equipment according to the equipment delivery list of the contract, without any omission, and pack all the equipment well or prepare it for transportation.


Post time: Mar-24-2022