Planned maintenance of nonwoven equipment

Relying solely on the state of nonwoven machinery maintenance will inevitably affect the reliability of long-term stable operation of the equipment and increase the risk of equipment "collapse". Therefore, nonwoven equipment maintenance also needs to be carried out according to a plan, that is, planned cycle maintenance. Planned cycle maintenance refers to the time-based, preventive nature, in accordance with the plan for timely repair of maintenance, including equipment maintenance, minor repairs and overhauls, it does not need to consider in depth the state of no equipment and whether it needs to be repaired.
In other words, during the inspection of the non woven fabric machine, for the equipment found to be abnormal, according to the priority and the degree of abnormality, the repair is carried out in a timely and appropriate manner. Planned cycle maintenance pays great attention to prior testing, collecting information and carrying out timely repairs. First, we must work out a total cycle schedule for annual maintenance, minor repairs and major repairs, and then arrange the work plan and acceptance methods for each time according to the total annual schedule, including the planned maintenance machine number, maintenance time, maintenance content and technical conditions for handover and acceptance after maintenance.

On the one hand, the maintenance plan should emphasize less downtime, and make full use of the downtime as much as possible to arrange the plan for equipment maintenance; on the other hand, the required maintenance content should be considered as thoroughly as possible, and break the limit of 8 hours a day for continuous repair operations to reduce the maintenance downtime and times. The maintenance plan should also be arranged to achieve moderate maintenance, only to disassemble and repair the faulty parts, only need to repair and replace the damaged parts, to further reduce the consumption of machine parts and downtime, to enhance the economic benefits of equipment and non-woven equipment operating rate.


Post time: Nov-04-2021

Send your message to us:

Write your message here and send it to us